Every before-and-after here shows the middle, and the final invoice.
Before-and-after is the most misleading thing in this trade: two photographs six weeks apart with everything in between left out — including what the job cost by the time it finished. So this page puts the middle back in, and prints the original quote next to the invoice that was actually paid.
Rear extension, 1930s semi
Quoted £68,400 · invoiced £71,150. The difference: a drain run found two metres from where the survey put it. Priced and signed off before it was moved.
See the jobKitchen and knock-through
Quoted £31,900 · invoiced £31,900. Nothing moved. It happens more often than the internet suggests when the drawings are finished before anyone starts.
See the jobLoft conversion with dormer
Quoted £54,000 · invoiced £59,750. The difference was almost all changes of mind — a second rooflight, a different staircase. Each one priced first, in writing.
See the jobThe house is colder for a fortnight — There's a hole in it. We board and seal at the end of every day, and in winter we'll tell you which fortnight it is so you can plan around it
There will be a week where nothing seems to happen — Usually waiting for an inspection, a steel or a window. It looks like abandonment and it isn't — you'll get told which week it is and why
First fix is the ugliest it gets — Bare walls, cables everywhere, no floor. This is the point people ring us at eleven at night, and it's also the point where it's furthest from finished and closest to on track
We start at eight and stop at five — Not seven. Not Sundays. Your neighbours are having this done to them too and they didn't choose it
One person is yours to ring — Named on day one, with a mobile number. Not a site office and not whoever answers
You changed your mind — Completely allowed and it is your house. It gets priced before it gets built, every time, including the small ones
A material price moved — Our quotes hold for 30 days and the order goes in early. Where a price moves after that we show you the supplier's invoice rather than a percentage
Access turned out to be different — No parking, no side gate, a skip permit the council won't grant. Boring, real, and it changes labour more than people expect
Nothing else is a reason — Not "it took longer than we thought", not "materials always go up", not the weather. Those are ours to carry and we priced them
Nothing extra is done on a nod — Every variation is priced, written down and agreed by you before it happens — especially the £80 ones. It is always the £80 ones that add up into the argument
A materials deposit is normal — Ask what it buys and get it itemised
A big payment up front is not — Ask what it's for, in writing, before you send it
Dates in writing, both ends — Start date and a finish date, in the quote
If we're late, we say early — A week's warning beats a good excuse afterwards
One toilet stays working — Planned into the programme from the start
Skip and permit are ours to sort — In the quote, not a surprise on week three
The trades come in an order and it can't be reshuffled — Groundworks, structure, roof, first fix, plaster, second fix, decoration. A plasterer cannot come early because the electrician is late
The weeks nothing happens are the inspections — Building control comes at set stages and we cannot cover work until they've seen it. We book them at the start of the job rather than the day before
Long-lead items get ordered in week one — Windows, steels, worktops, anything made to size. It's the single biggest cause of a job stopping dead and it's avoidable
The last ten per cent takes a fifth of the time — Snagging, second fix, the door that needs easing. It is the most frustrating part for everybody and rushing it is how a good job ends badly
Handover is a walk round with a list — We write it, you add to it, and we agree a date for the last item before the final invoice — not after
What we will give you for free is a range — On the phone, in five minutes, before anybody visits. It's wide on purpose and it is enough to tell you whether to carry on
The quote itself is free and it is a real document — Itemised by trade, with the exclusions listed as plainly as the inclusions. Nobody pays us to be told what something costs
Compare quotes on what's excluded — That's where the difference between three prices usually lives. A cheap quote with no kitchen fitting, no making good and no skip is not a cheap quote
We'll tell you when we're the wrong firm — Too small, too far, or the wrong trade. It happens most weeks and it costs nothing to say
Guarantees, honestly — Say what yours is and who backs it. Our own guarantee is only worth anything while we exist — an insurance-backed one survives that, and if you don't have one, your page should say so rather than say nothing
Ask for a quote